698
Thanks, UPS! (lemmy.wtf)
submitted 2 months ago by meldrik@lemmy.wtf to c/facepalm@lemmy.wtf
you are viewing a single comment's thread
view the rest of the comments
[-] Transporter_Room_3@startrek.website 11 points 2 months ago

I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.

But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.

My wife, on the other hand, is the "I tried to wiggle it lightly a few times so now I am giving up". Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn't work. I simply went over and flipped the switch up and left it there to actually power up.

People like that 100% exist.

[-] chicken@lemmy.dbzer0.com 6 points 2 months ago

tbf I would definitely consider an 800ms delay on a light bulb as that light bulb not working and needing to be replaced

[-] astrsk@fedia.io 2 points 2 months ago

Taking the handle off is exactly what I’d do, no need to scale the side of a building lmao.

this post was submitted on 21 Aug 2024
698 points (93.7% liked)

Facepalm

186 readers
1 users here now

Anything that makes you apply your hand to your face.

founded 4 months ago
MODERATORS