12
submitted 3 months ago by averyminya@beehaw.org to c/chat@beehaw.org

I made a mistake in my dates and so I have a few chapters to edit and upload and I have work tomorrow morning. Gonna be rough.

So, to make myself feel better, what are you time crunching this week?

you are viewing a single comment's thread
view the rest of the comments
[-] azdle@news.idlestate.org 6 points 3 months ago

At work we have a contractual design deliverable that was due yesterday, I still can't get anybody to tell me what I'm supposed to be designing/building. I've got the contract, but its so vague that it's more unhelpful than it is helpful and there's apparently been 9 months of conversations with the customer, none of which have included engineering, nor has anything from them been written down. So we're designing something just based on rumors.

So we're in crunch mode, but also we don't know what we're trying to accomplish... 😩

[-] Kissaki@beehaw.org 6 points 3 months ago

That sucks.

Talks without any documentation is as if it didn't happen.

[-] azdle@news.idlestate.org 3 points 3 months ago

Yep, I'm genuinely unsure if the conversations actually happened or not. I've gotten different answers to that from different people.

[-] averyminya@beehaw.org 3 points 3 months ago

That sounds terrible! This sounds like a really common situation I hear in certain industries - vague idea guys postulating stuff they know nothing about and expect some sort of return from their " genius " space intended.

Even worse when the culture of asking questions is frowned upon, "you didn't get what I was saying?" is such a horrible tactic. I've had to deal with this type before, but thankfully I worked in the arts and so that's a little more expected, and abstract. Or the other way around I guess, lol. One that particularly stands out was a lead dancer that "had a vision" for his stage lighting and it was one of the longest, most drawn out, egregiously tedious experiences of my life. Wanting things that he knew we couldn't do (we showcase our space every time and clearly detail our ((few)) limitations), wanting things that I'm pretty sure don't even exist, needed to change things multiple sets back after we've moved on from them.

The sort of thing that look like there's no planning at all. The fucked up part is that it was almost the opposite, he has 2 full notebooks for this 3 hour performance which is just like kind of unheard of for staging.

I will say though, I made it work and it was a great visually stunning show, with things that I haven't really seen before. So I can't really fault him in particular, because he also actually really did put in the work. It was just absolutely terrible to create. I don't mind getting lights to flash with the beat, but getting cues for individual drums in quarter and 16th notes is... Draining. And there was so much more manual work than there should have been, there's a normal amount of cueing and changes for a team to do and then there's the team working through every single song with no breaks. Like we were those overhype DJ's with a prerecorded set.

this post was submitted on 01 Aug 2024
12 points (100.0% liked)

Chat

7499 readers
7 users here now

Relaxed section for discussion and debate that doesn't fit anywhere else. Whether it's advice, how your week is going, a link that's at the back of your mind, or something like that, it can likely go here.


Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 2 years ago
MODERATORS