Starbase activities (2025-07-24):
- Jul 22nd cryo delivery tally. (ViX)
- Overnight, the salvaged B13 aft section is transported from Brownsville port to Massey's. (Starship Gazer 1, Starship Gazer 2, Starship Gazer 3, Starship Gazer 4, NSF 1, NSF 2, NSF 3, Gomez)
- Also overnight, pipes at Pad 1 are purged, likely in anticipation of installing the ship quick disconnect. (Anderson)
- Cryo pipes are tested on the far side of Pad 1. (Gisler 1, Gisler 2)
- Gisler posts recent photos of the Pad 2 quick disconnect progress. (Gisler 1, Gisler 2, Gisler 3, Gisler 4, Gisler 5, Gisler 6)
- RGV Aerial post a flyover photo of the tank farm.
- "Shortly before the next flight, I will do a live technical update on Starship, going over progress to date and engineering/production/launch plans for the future." (Elon) He said that last time too though, so take with a grain of salt :)