this post was submitted on 10 Jun 2025
17 points (94.7% liked)

United Kingdom

4949 readers
138 users here now

General community for news/discussion in the UK.

Less serious posts should go in !casualuk@feddit.uk or !andfinally@feddit.uk
More serious politics should go in !uk_politics@feddit.uk.

Try not to spam the same link to multiple feddit.uk communities.
Pick the most appropriate, and put it there.

Posts should be related to UK-centric news, and should be either a link to a reputable source, or a text post on this community.

Opinion pieces are also allowed, provided they are not misleading/misrepresented/drivel, and have proper sources.

If you think "reputable news source" needs some definition, by all means start a meta thread.

Posts should be manually submitted, not by bot. Link titles should not be editorialised.

Disappointing comments will generally be left to fester in ratio, outright horrible comments will be removed.
Message the mods if you feel something really should be removed, or if a user seems to have a pattern of awful comments.

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Womble@lemmy.world 2 points 4 days ago (1 children)

There are grid connection delays of 8 to 10 years for lots of renewable energy projects, as the grid wasnt designed to have many small inputs, so its not like there arent issues there too, and thats before you start getting into reliability issues once the percentage of non-dispatachable energy gets higher.

In general both need to be invested in heavily, and structural reforms done, if we have a chance of actually meeting climate goals. Thankfully that seems to be the plan.

[–] luisgutz@feddit.uk 2 points 4 days ago

Very interesting. Thanks for sharing. Funny enough, the article mentions 54 billion of investment on the national grid is needed over the next 10 years, and hinkley point currently costs 31!