17

Can I put an additional load before switches on a dedicated circuit?

The example circuit goes from the service panel to a two-way (SPDT) switch at the house back door. From there the circuit goes to another two-way switch out in the garage. The circuit then powers the garage lights.

The goal is to add additional lights on this circuit near the service panel so that the same switches would also control the new lights.

How wrong would it be to add this new load between the service panel and the first two-way switch? This would save the (huge) effort to run wire from the garage back to the house.

you are viewing a single comment's thread
view the rest of the comments
[-] lettruthout@lemmy.world 1 points 6 months ago

Of course… Something was nagging at me that I shouldn’t do this. Your reply’s mention of being serial was the source of the nag. I’ll explore damium’s current sensing idea instead. Thank you!

this post was submitted on 21 Apr 2024
17 points (94.7% liked)

Electricians

465 readers
1 users here now

founded 1 year ago
MODERATORS