657
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 27 Jun 2024
657 points (69.4% liked)
Memes
45560 readers
1420 users here now
Rules:
- Be civil and nice.
- Try not to excessively repost, as a rule of thumb, wait at least 2 months to do it if you have to.
founded 5 years ago
MODERATORS
Wdym skilled labor? I mean, nuclear mostly take bog standard constructions and the experts cannot be "repurposed" for renewables as well.
Nuclear is nothing bog standard. If it was, it wouldn't take 10 years. Almost every plant is a boutique job that requires lots of specialists. The Westinghouse AP1000 reactor design was meant to get around this. It didn't.
The experts can stay where they are: maintaining existing nuclear power.
Renewables don't take much skilled labor at all. It's putting solar panels on racks in a field, or hoisting wind blades up a tower (crane operation is a specialty, but not on the level of nuclear engineering).
I mean, it seems normal for big structure constructions to take 5 years at least..
About bog standard construction, I meant not standardized nuclear, but that many parts of it is just constructions
And 5 years is what nuclear projects have promised at the start over the years. Everyone involved knows this is a gross lie.
I guess you are talking about US, since 5 years is standard from beginning constructions.
China built a few Ap1000 designs. The Sanmen station started in 2009 with completion expected in 2014 (2015 for the second unit). It went into 2019. The second, Haiyang, went about the same.
This is pretty similar to what happened in the US with Volgte.
Interesting, that was not what happened in my country. Sometimes it does take 8 years from allowance to finishing, but that's it.