4
HS2’s Euston leg poised to be given green light despite cost concerns
(www.telegraph.co.uk)
The cost is just the cost. If it doesn’t get built to Euston, the rest of HS2 is basically almost pointless
I know it is never going to happen Euston needs a full rebuild. It is, by far, the worst terminus in London. It is completely unsafe, inaccessible, and unable to cope with its capacity needs. Even Lumo trains are better.
Talk about the UK rail network.