22
submitted 3 weeks ago* (last edited 3 weeks ago) by GrayBackgroundMusic@lemm.ee to c/satisfactory@lemmy.world

I cannot, for the life of me, understand liquids. If something says 10m head lift, that means it can go up 10m, right? RIGHT? it doesn't. It stalls on a 4m foundation. I'm so frustrated. I shove pumps everywhere and still nothing works. I even have 2 pipes next to each other but one works and the other doesn't! ARRRGGHHHH

I'm JUUUUUUUUUST about to package everything and conveyor belt it.

you are viewing a single comment's thread
view the rest of the comments
[-] xmunk@sh.itjust.works 9 points 3 weeks ago

One thing that might be fucking you over is bugs. Both ceiling and wall sockets can cause pipeline flow bugs - I switched to using only:

  • Default (not clean) mk1/2 pipes
  • Pumps mk1/2
  • Valves
  • Intersections
  • Pipe supports (the default thing when building pipelines)
  • Pipe wall supports
  • Stackable pipeline supports

I never touch wall/ceiling sockets and have had to fully destroy networks that got into a bugged state because of them, and I just clip my pipes through walls when necessary.

I also try quite hard to never lift fluids as pumps can bug the fuck out - so I'll usually build factories at grade or pump water down from elevated reservoirs (like the crater lakes).

Fluids are super broken IMO due to some rare but devastating bugs and the extremely limited pipe throughput... I'd personally rather they just treated them as solids using conveyor belts than the state they're in right now.

[-] TheRedSpade@lemmy.world 2 points 3 weeks ago

Both ceiling and wall sockets can cause pipeline flow bugs

I wonder if this is why my blueprinted refineries don't output until I remove/replace the output lines. I don't have any floor or wall holes in the finished blueprint, but I used both to align things when creating it.

[-] xmunk@sh.itjust.works 1 points 3 weeks ago

I'd suspect so. I've gotten in the habit of aggressively using stackable pipeline supports for all alignment and making good use of horizontal to vertical pipe layouts for aligning floor entry points.

this post was submitted on 22 Oct 2024
22 points (100.0% liked)

Satisfactory

1488 readers
53 users here now

The unofficial Lemmy community for Satisfactory, the factory-building and exploration game.

Useful Links:

Looking for Group?

@MentalEdge@sopuli.xyz started a dedicated server and welcomes Fediverse users, find out more by DMing them or joining this steam chat

Rules

  1. No bigotry - including racism, sexism, ableism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No NSFW content
  4. No ads/spamming

founded 1 year ago
MODERATORS