[-] Num10ck@lemmy.world 12 points 8 months ago

wikipedia says 20 to 40 million people would be without electricity for between 16 days and 1-2 years.

[-] 0110010001100010@lemmy.world 15 points 8 months ago

1-2 years.

I worked for an electric utility for nearly 2 decades and now am a consultant helping power companies with grid modernization. This is the part that terrifies me, we are WOEFULLY unprepared for an event like this. A number of times over the years a strategic transformer reserve has been floated to congress with no movement. Even things like a large scale, coordinated attack against a bunch of substations at once could cripple the US power grid for months or even years. Transformer lead-times can be as long at 70 weeks last I knew. Obviously, in the event of a large-scale event the government could step in and throw resources to speed that up but it would be FAR better to have a ready-to-go supply we could draw from.

[-] Num10ck@lemmy.world 3 points 8 months ago

what i wonder is this something that can be solved without government long range wisdom? like could you start a business stockpiling these things and being the only game in town when theres a disaster? or are the disasters so rare and the price gouging so limited that it would be a bad business move to sit on a square mile of these somewhere inexpensive and safe?

[-] 0110010001100010@lemmy.world 5 points 8 months ago

Great question, and I should have probably clarified my response. There are transformers, the "cans" you see on utility poles. Then there are transformers, the "big boys" in substations. This is one of the better pics I can find on Google, oddly enough it links to an article about how easy it is to disable a substation by shooting out the transformer: https://stopfossilfuels.org/electric-grid/shooting-transformers-disables-substations/buckskin-substation-transformer-shooting.jpg

The cans you see on poles are relatively ubiquitous and fairly easy to source. The big boys in the substations are the ones with the huge lead times and large cost. Stockpiling them as a business would be a loosing venture. It would be unlikely you would have a customer locally and transporting them is expensive owing to the weight/size.

[-] MySNsucks923@lemmy.zip 1 points 8 months ago

As someone who works for a large utility company on the distribution side, the small ones on poles or in underground neighborhoods are still tough to get with backorders causing delays in projects. It’s gotten a lot better, but it’s still slow on them.

[-] agitatedpotato@lemmy.world 3 points 8 months ago* (last edited 8 months ago)

I know amateur radio operators who have emergency equipment stashed in containers designed to keep the radiation out so they have a backup in case literally everything else they have goes down.

[-] Num10ck@lemmy.world 2 points 8 months ago

smart idea but but maybe even better to leave the cities if everything is going to be dark for seasons.

[-] agitatedpotato@lemmy.world 2 points 8 months ago

Radio works outside the city too, and most of the time I see people tossing a HF mobile rig in there. A solid one of those can run 100w off a car battery and if you can get a random wire antenna over a 35-40 foot high branch you'd probably be able to cover the country on the lower bands so long as the ionosphere isn't too irregular. You can even get car appropriate sized antennas for the higher frequency, shorter range bands.

[-] BearOfaTime@lemm.ee 2 points 8 months ago

Honestly that's surprisingly low. I mean I wouldn't want to be part of that group, but that's perhaps 10% of the US population.

I'm actually a bit reassured that a Carrington event wouldn't be even more devastating.

[-] Num10ck@lemmy.world 1 points 8 months ago

or maybe they don't want the population to freak out about it and demand wisdom and real security from leadership?

[-] BearOfaTime@lemm.ee 1 points 8 months ago

Lol, well, you're not wrong.

Definitely need to evaluate the source of that info.

On the one hand, I'd think engineers would bring these issues up, and have ideas how to mitigate risks, in any industry that could be affected (especially power/telecom, since they affect every utility). On the other hand, I can also see management deciding to pay lip service to the identified risks.

this post was submitted on 22 Jan 2024
243 points (98.0% liked)

Technology

58137 readers
7137 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.